Proof of concept

Four years on the Mary Valley Rattler.

Before Transend was a product, a first version of it ran for four years on a working railway in Queensland, Australia. The commercial product was designed from what those four years taught us.

The Mary Valley Rattler heritage train crossing a bridge in Queensland

Why this train

Old equipment, on purpose.

The train was chosen because its equipment is the kind of legacy system found on freight railways around the world. The line is a demanding one too, which made it a hard test for the system.

What was tested

The whole system, not one sensor.

The first complete system went onto the train in 2020. Over the four years that followed it was tested above rail and below rail:

  • A low-power IoT network between the units, and from carriage to carriage along the train
  • The train reading hand-operated points ahead of it
  • Communications from the train to the cloud
  • Displays on the train, and remote ones
  • Remote programming and remote downloads
  • Energy harvesting to power the units
  • Track monitoring

Some of what it caught

Four findings from the four years.

  • Handbrake on, train moving

    A switch on every car's handbrake. Applied while parked at the station it is a status. Applied with the train under way it is an alarm, before the wheels flatten and the blocks overheat.

  • Points read before the driver could see them

    A monitor on each set of hand-operated points tells the approaching train which way they lie.

  • A rail car left behind

    A carriage stayed in the workshop for overhaul. When the train left the yard without it, Transend raised a lost rail car alarm.

  • A flat battery, traced to a connector

    The supply voltage charged on the way out and was flat on the return. Maintenance traced it to a faulty connector from the graph, not from a breakdown.

The case study

The findings, in full.

The case study has the data behind this page. Tell us who you are and we will send it.

Request the case study

See Transend on your own network.

Half an hour with the team: the sensors, the dashboard, and what a trial on your wagons would involve.